Sunday, January 3, 2010

Latest Projects.....

The new laminate floor is done in the Dinning room except for the transition to the Kitchen as Lumber Liquidators had to order the piece.

The last of the ugly lights is gone, this is the new light over the Kitchen sink(Thank You ECV).
I also installed a new single lever faucet in place of the double lever that was in the sink.
I also changed out the light switch in the utility room with a motion sensing one so now I don't have to stumble my way through the dark room to the switch next to the back door.
Right now I am waiting for the tile to set in the entry so that I can grout it, I'll post a pic as soon as it is done later today.

No comments:

Post a Comment